Files from www2.douglasma.org/sbc/files

Unless indicated, all items listed here are in-progress/draft items. Schematic Design is ongoing, and additional changes will be made.

Dates shown are the dates the files were added to this archive. You can click on a column header to sort.

Filename Size Date Description
091229-HeeryContract.pdf 3.89 MB 2010-12-12 10:05 PM Feasibility agreement with Heery, December 2009
10521 10-11-04 Alternatives Considered Reduced.pdf 2.9 MB 2011-02-22 2:05 PM
10521 11-01-25 Multi Cmte Mtg.pdf 28.08 MB 2011-01-27 10:27 AM
10521 11-01-25 PLN-SD MS FloorPlans11x17R.pdf 383.05 KB 2011-01-31 5:37 PM
10521 3.0.01-1st Floor Plan.pdf 234.15 KB 2010-12-17 11:35 AM New Elementary School first floor, December 9, 2010
10521 3.0.02-2nd Floor Plan.pdf 802.28 KB 2010-12-17 11:30 AM New Elementary School second floor, December 9, 2010
10521 3.0.03-3rd Floor Plan.pdf 698.31 KB 2010-12-17 11:30 AM New Elementary School third floor, December 9, 2010
10521 DD Room Data Sheets 11-05-06.pdf 6.73 MB 2011-05-10 9:02 AM
10521 ES Flythrough 11-03-09-FINAL.mov 85.57 MB 2011-03-16 4:13 PM
10521 Model School Presentation 10-11-04 Reduced.pdf 3.26 MB 2011-02-22 2:04 PM
10521 Repair Costs.xls 25.5 KB 2010-12-12 8:43 AM Estimate of minimal repair and modular costs with no MSBA assistance. From DiNisco, November 4, 2010.
10521 SD 10-12-10 Site Circulation.pdf 3.39 MB 2010-12-17 11:31 AM Site circulation layout, December 10, 2010
10521 SD 10-12-10 Site Utilities Plan-1.pdf 1.69 MB 2010-12-17 11:32 AM Site utilities layout, December 10, 2010
10521 SD-MasterPlan-w-BaseballFld.pdf 2.59 MB 2010-12-17 11:32 AM Athletic fields master plan, showing one set of options. December 10, 2010.
10521 SD-MasterPlan.pdf 2.61 MB 2010-12-17 11:33 AM Athletic fields master plan, showing one set of options. December 10, 2010.
10521 SPL-11-02-18 SD_ES Site Plan.jpg 1.38 MB 2011-03-17 10:40 AM
10521 SPL-11-03-07 SD_ES 02.jpg 4.17 MB 2011-03-17 10:40 AM
10521 SPL-Perspective View - North-West.jpg 1.02 MB 2011-03-17 10:40 AM
10521 ST 10-06-28 IntermediateSchool-Floor Plans.pdf 198.47 KB 2010-12-12 10:01 PM Intermediate School floor plans (Existing), June 2010
10521 ST 10-06-30 AerialPhoto 2009-DouglasSchlCampus-VarioiusScales-v2Rdc.pdf 1.84 MB 2011-03-17 10:40 AM
11-01-26 Parking Plan.pdf 4.67 MB 2011-01-27 10:09 AM
11-01-26 Updated Circulation Plan.pdf 7.31 MB 2011-01-27 10:06 AM
11-02-18_MSBA_SD_Submission_all_except_budget.zip 202.4 MB 2011-02-21 12:01 AM
11-05-25 Site Survey 512 B 2011-05-27 8:14 AM
2011-10 90 Percent Design 512 B 2011-10-24 9:04 AM
2011-10 Haul Road addendum 512 B 2011-10-25 9:31 AM
2011-10 Haul Road final design 512 B 2011-10-23 10:24 PM
2011-12 Design-Specs 512 B 2011-12-10 8:04 PM
Ballot 4-5-11.pdf 20.03 KB 2011-03-21 10:47 AM
Current Residential Developments 101006-units.pdf 87.84 KB 2010-12-12 10:03 PM Current Douglas residential developments, October 2010
DOUGLAS ELEMENTARY SCHOOL STUDY 10-10-26.pdf 146.75 KB 2010-12-12 8:44 AM Detailed (and estimated) cost breakdown of Intermediate Elementary School repair and new Elementary School construction, based on feasibility study. This does not include design fees or some other significant costs, which are calculated separately. From DiNisco, October 27, 2010.
Douglas 11-02-15 BOS Mtg.pdf 4 MB 2011-02-16 12:08 PM
Douglas Board-3 FINAL 03-10.pdf 6.25 MB 2011-03-17 10:45 AM
Douglas Cost Reconciliation 11-02-10 MTG Correct.pdf 120.7 KB 2011-02-11 1:32 AM This was the price breakdown used during the February 10, 2011 meeting of the School Building Committee. It includes a high level cost breakdown of the project. This represents the breakdown at the start of the meeting. Changes were made during the meeting.
Douglas DESE Submittal.zip 4.93 MB 2011-01-13 9:18 PM
Douglas ES total Project Budget PS&B final.pdf 44.12 KB 2011-03-26 3:15 PM
Douglas IS Geotechnical Schematic Phase Report 11-3-10.pdf 9.06 MB 2010-12-12 8:43 AM Geotechnical report (soil borings etc), November 3, 2010
Douglas IS total Project Budget PS&B final.pdf 16.35 KB 2011-03-26 3:15 PM
Douglas Intermediate School - Precast Plank Topping.pdf 96.25 KB 2011-01-10 4:41 PM
Douglas Intermediate School Ph I ESA (full).pdf 14.84 MB 2011-01-03 10:13 AM PHASE I ENVIRONMENTAL SITE ASSESSMENT, provided by DiNisco January 3, 2011
Douglas prelim MA-CHPS Scorecard.pdf 946.82 KB 2010-12-17 11:33 AM MA-CHPS is one method of achieving "green school" status for energy conservation. We will likely use the more common "LEED" system, but this MA-CHPS scorecard was created prior to that discussion.
Elementary School - PK-1.pdf 518.13 KB 2010-12-12 10:06 PM Current Elementary School floor plan once converted to PreK-1
FinCom Flyer STM 03-28-11.pdf 268.8 KB 2011-03-18 12:22 AM
Final enrollment certification and cover letter - Douglas 12.21.10.pdf 416.63 KB 2010-12-21 4:24 PM
FortBanksSchool.jpg 274.4 KB 2011-03-21 8:57 AM
MSBA 50-percent submittal 2011-08 512 B 2011-08-26 10:23 AM
Meeting Materials - SBC_2011_04_07 512 B 2011-04-11 1:52 PM
Meeting Materials - SBC_2011_05_05 512 B 2011-05-10 8:59 AM
Meeting Materials - SBC_2011_06_02 1.5 KB 2011-06-02 6:16 PM
MeetingMaterials-SBC_2011_07_07 1 KB 2011-07-01 5:56 PM
MeetingMaterials-SBC_2011_08_04 512 B 2011-07-28 1:23 PM
MeetingMaterials-SBC_2011_08_25 1 KB 2011-08-26 10:01 AM
MeetingMaterials-SBC_2011_09_29 512 B 2011-10-27 10:42 AM
MeetingMaterials-SBC_2011_10_27 512 B 2011-10-27 10:11 AM
MeetingMaterials-SBC_2011_12_15 512 B 2011-12-13 10:38 PM
MeetingMaterials-SBC_2012_01_19 1 KB 2012-01-19 8:53 AM
NewSiteLayout.jpg 201.33 KB 2011-03-21 8:54 AM
Perspective - Aerial.jpg 767.13 KB 2011-03-17 11:17 AM
Project Update Presentation 2011-10-12.pdf 52.98 MB 2011-10-12 9:11 PM
Public Info Meeting Presentation 2010-11-04 Reduced.pdf 1.72 MB 2011-02-22 2:03 PM
Public Info Meeting Presentation 2011-03-17.pdf 4.46 MB 2011-03-18 12:15 AM
STM Presentation 2010-11-15 Final.pdf 497.72 KB 2010-12-16 11:33 PM Special Town Meeting presentation (November 15, 2010), requesting Schematic Design funding.
STM Presentation 2011-03-28 FINAL.pdf 35.87 MB 2011-03-30 9:53 PM
SchematicDesignSubmittal 1 KB 2011-02-21 8:07 AM
Signed agreement DiNisco Feasibility.pdf 11.69 MB 2010-11-21 11:50 AM Feasibility agreement with DiNisco, June 2010
Site for STM mailer (smaller).jpg 489.12 KB 2011-03-17 10:45 AM
Status report Jan 30 2011.pdf 73.85 KB 2011-02-03 6:18 PM
Test Reports 2011-05-26 512 B 2011-05-27 8:22 AM
index-empty.html 0 B 2011-07-12 12:32 PM




Edit List
Password: