Unless indicated, all items listed here are in-progress/draft items. Schematic Design is ongoing, and additional changes will be made.
Dates shown are the dates the files were added to this archive. You can click on a column header to sort.
| Filename | Size | Date | Description |
|---|---|---|---|
| 091229-HeeryContract.pdf | 3.89 MB | 2010-12-12 10:05 PM | Feasibility agreement with Heery, December 2009 |
| 10521 10-11-04 Alternatives Considered Reduced.pdf | 2.9 MB | 2011-02-22 2:05 PM | |
| 10521 11-01-25 Multi Cmte Mtg.pdf | 28.08 MB | 2011-01-27 10:27 AM | |
| 10521 11-01-25 PLN-SD MS FloorPlans11x17R.pdf | 383.05 KB | 2011-01-31 5:37 PM | |
| 10521 3.0.01-1st Floor Plan.pdf | 234.15 KB | 2010-12-17 11:35 AM | New Elementary School first floor, December 9, 2010 |
| 10521 3.0.02-2nd Floor Plan.pdf | 802.28 KB | 2010-12-17 11:30 AM | New Elementary School second floor, December 9, 2010 |
| 10521 3.0.03-3rd Floor Plan.pdf | 698.31 KB | 2010-12-17 11:30 AM | New Elementary School third floor, December 9, 2010 |
| 10521 DD Room Data Sheets 11-05-06.pdf | 6.73 MB | 2011-05-10 9:02 AM | |
| 10521 ES Flythrough 11-03-09-FINAL.mov | 85.57 MB | 2011-03-16 4:13 PM | |
| 10521 Model School Presentation 10-11-04 Reduced.pdf | 3.26 MB | 2011-02-22 2:04 PM | |
| 10521 Repair Costs.xls | 25.5 KB | 2010-12-12 8:43 AM | Estimate of minimal repair and modular costs with no MSBA assistance. From DiNisco, November 4, 2010. |
| 10521 SD 10-12-10 Site Circulation.pdf | 3.39 MB | 2010-12-17 11:31 AM | Site circulation layout, December 10, 2010 |
| 10521 SD 10-12-10 Site Utilities Plan-1.pdf | 1.69 MB | 2010-12-17 11:32 AM | Site utilities layout, December 10, 2010 |
| 10521 SD-MasterPlan-w-BaseballFld.pdf | 2.59 MB | 2010-12-17 11:32 AM | Athletic fields master plan, showing one set of options. December 10, 2010. |
| 10521 SD-MasterPlan.pdf | 2.61 MB | 2010-12-17 11:33 AM | Athletic fields master plan, showing one set of options. December 10, 2010. |
| 10521 SPL-11-02-18 SD_ES Site Plan.jpg | 1.38 MB | 2011-03-17 10:40 AM | |
| 10521 SPL-11-03-07 SD_ES 02.jpg | 4.17 MB | 2011-03-17 10:40 AM | |
| 10521 SPL-Perspective View - North-West.jpg | 1.02 MB | 2011-03-17 10:40 AM | |
| 10521 ST 10-06-28 IntermediateSchool-Floor Plans.pdf | 198.47 KB | 2010-12-12 10:01 PM | Intermediate School floor plans (Existing), June 2010 |
| 10521 ST 10-06-30 AerialPhoto 2009-DouglasSchlCampus-VarioiusScales-v2Rdc.pdf | 1.84 MB | 2011-03-17 10:40 AM | |
| 11-01-26 Parking Plan.pdf | 4.67 MB | 2011-01-27 10:09 AM | |
| 11-01-26 Updated Circulation Plan.pdf | 7.31 MB | 2011-01-27 10:06 AM | |
| 11-02-18_MSBA_SD_Submission_all_except_budget.zip | 202.4 MB | 2011-02-21 12:01 AM | |
| 11-05-25 Site Survey | 512 B | 2011-05-27 8:14 AM | |
| 2011-10 90 Percent Design | 512 B | 2011-10-24 9:04 AM | |
| 2011-10 Haul Road addendum | 512 B | 2011-10-25 9:31 AM | |
| 2011-10 Haul Road final design | 512 B | 2011-10-23 10:24 PM | |
| 2011-12 Design-Specs | 512 B | 2011-12-10 8:04 PM | |
| Ballot 4-5-11.pdf | 20.03 KB | 2011-03-21 10:47 AM | |
| Current Residential Developments 101006-units.pdf | 87.84 KB | 2010-12-12 10:03 PM | Current Douglas residential developments, October 2010 |
| DOUGLAS ELEMENTARY SCHOOL STUDY 10-10-26.pdf | 146.75 KB | 2010-12-12 8:44 AM | Detailed (and estimated) cost breakdown of Intermediate Elementary School repair and new Elementary School construction, based on feasibility study. This does not include design fees or some other significant costs, which are calculated separately. From DiNisco, October 27, 2010. |
| Douglas 11-02-15 BOS Mtg.pdf | 4 MB | 2011-02-16 12:08 PM | |
| Douglas Board-3 FINAL 03-10.pdf | 6.25 MB | 2011-03-17 10:45 AM | |
| Douglas Cost Reconciliation 11-02-10 MTG Correct.pdf | 120.7 KB | 2011-02-11 1:32 AM | This was the price breakdown used during the February 10, 2011 meeting of the School Building Committee. It includes a high level cost breakdown of the project. This represents the breakdown at the start of the meeting. Changes were made during the meeting. |
| Douglas DESE Submittal.zip | 4.93 MB | 2011-01-13 9:18 PM | |
| Douglas ES total Project Budget PS&B final.pdf | 44.12 KB | 2011-03-26 3:15 PM | |
| Douglas IS Geotechnical Schematic Phase Report 11-3-10.pdf | 9.06 MB | 2010-12-12 8:43 AM | Geotechnical report (soil borings etc), November 3, 2010 |
| Douglas IS total Project Budget PS&B final.pdf | 16.35 KB | 2011-03-26 3:15 PM | |
| Douglas Intermediate School - Precast Plank Topping.pdf | 96.25 KB | 2011-01-10 4:41 PM | |
| Douglas Intermediate School Ph I ESA (full).pdf | 14.84 MB | 2011-01-03 10:13 AM | PHASE I ENVIRONMENTAL SITE ASSESSMENT, provided by DiNisco January 3, 2011 |
| Douglas prelim MA-CHPS Scorecard.pdf | 946.82 KB | 2010-12-17 11:33 AM | MA-CHPS is one method of achieving "green school" status for energy conservation. We will likely use the more common "LEED" system, but this MA-CHPS scorecard was created prior to that discussion. |
| Elementary School - PK-1.pdf | 518.13 KB | 2010-12-12 10:06 PM | Current Elementary School floor plan once converted to PreK-1 |
| FinCom Flyer STM 03-28-11.pdf | 268.8 KB | 2011-03-18 12:22 AM | |
| Final enrollment certification and cover letter - Douglas 12.21.10.pdf | 416.63 KB | 2010-12-21 4:24 PM | |
| FortBanksSchool.jpg | 274.4 KB | 2011-03-21 8:57 AM | |
| MSBA 50-percent submittal 2011-08 | 512 B | 2011-08-26 10:23 AM | |
| Meeting Materials - SBC_2011_04_07 | 512 B | 2011-04-11 1:52 PM | |
| Meeting Materials - SBC_2011_05_05 | 512 B | 2011-05-10 8:59 AM | |
| Meeting Materials - SBC_2011_06_02 | 1.5 KB | 2011-06-02 6:16 PM | |
| MeetingMaterials-SBC_2011_07_07 | 1 KB | 2011-07-01 5:56 PM | |
| MeetingMaterials-SBC_2011_08_04 | 512 B | 2011-07-28 1:23 PM | |
| MeetingMaterials-SBC_2011_08_25 | 1 KB | 2011-08-26 10:01 AM | |
| MeetingMaterials-SBC_2011_09_29 | 512 B | 2011-10-27 10:42 AM | |
| MeetingMaterials-SBC_2011_10_27 | 512 B | 2011-10-27 10:11 AM | |
| MeetingMaterials-SBC_2011_12_15 | 512 B | 2011-12-13 10:38 PM | |
| MeetingMaterials-SBC_2012_01_19 | 1 KB | 2012-01-19 8:53 AM | |
| NewSiteLayout.jpg | 201.33 KB | 2011-03-21 8:54 AM | |
| Perspective - Aerial.jpg | 767.13 KB | 2011-03-17 11:17 AM | |
| Project Update Presentation 2011-10-12.pdf | 52.98 MB | 2011-10-12 9:11 PM | |
| Public Info Meeting Presentation 2010-11-04 Reduced.pdf | 1.72 MB | 2011-02-22 2:03 PM | |
| Public Info Meeting Presentation 2011-03-17.pdf | 4.46 MB | 2011-03-18 12:15 AM | |
| STM Presentation 2010-11-15 Final.pdf | 497.72 KB | 2010-12-16 11:33 PM | Special Town Meeting presentation (November 15, 2010), requesting Schematic Design funding. |
| STM Presentation 2011-03-28 FINAL.pdf | 35.87 MB | 2011-03-30 9:53 PM | |
| SchematicDesignSubmittal | 1 KB | 2011-02-21 8:07 AM | |
| Signed agreement DiNisco Feasibility.pdf | 11.69 MB | 2010-11-21 11:50 AM | Feasibility agreement with DiNisco, June 2010 |
| Site for STM mailer (smaller).jpg | 489.12 KB | 2011-03-17 10:45 AM | |
| Status report Jan 30 2011.pdf | 73.85 KB | 2011-02-03 6:18 PM | |
| Test Reports 2011-05-26 | 512 B | 2011-05-27 8:22 AM | |
| index-empty.html | 0 B | 2011-07-12 12:32 PM |